I am putting up an old zimm pivot and adding a gen 2 span in the my wiring diagrams show the gray or tan wire running through all the.
Pivot stepping gauge wiring diagram.
Ing gaugf hexagonal washer nut possible to adjust position of shift lamp.
In the water.
1 sign zimmatic by lindsay pivot to the third step as shown in the diagram.
1 000rpm before setting.
Install our black wire into the relay assembly as shown see picture 1 below relay part number.
Electrical system schematic decal.
Stalled the 2 1 16 52 mm gauges.
Wiring chart of rotation signal eol 595kb in japanese multi gauge.
Stepping gauge gekko series common to both series product name part number download data.
Stepping gauge 2 pin coupler common 501 fil fir not used.
Signal diagram white wire tw connect to the engine computer s water temp signal wire.
Gekko and other stepping gauges.
501 fol for connect to 2 pin coupler cable from shift lamp.
The key to this step is to position the float as close as.
4 pin coupler common connect to 4 pin coupler cable.
Pivot corporation 3 okada shimo okada matsumoto shi nagano 390 0313 tel0263 46 5901.
See note at top of page 2.
Close tightly with wire electrical tape.
Use a wire nut to connect our blue black wire to the rienke orange percent timer wire that was removed from the terminal strip in step 5 7.
Wire coming from the center and install our red black and brown black wires in its place.
Product name part number.
Stepping gauge teivip s sg wts wtsg basic wiring meter connecting the wires.
Illumination wiring of the speedometer and the 2 1 16 52 mm gauges should be done at the same time.
Standard pivot box 11 wire pivot panel csa parts list.
User s manuals for our 52x series xv and other products for european car models.
Diagram a shows a properly mounted gauge.
Is the worlds largest privately held manufacturer of center pivot and lateral move irrigation systems.
For each ø80 gauge.
Other wiring should be done in whatever sequence is easiest for you.
Install a wire nut onto to cap off the rienke yellow.
87 3 shimookada okada matsumoto shi nagano 390 0313 japan.
Use a wire nut to connect our red wire to the reinke brown safety wire that was removed from the terminal strip in step 1.
See diagram below make sure to securely tight en hexagonal nut.
Remove the rienke yellow endgun wire from the terminal strip in the end tower box span cable side and install our brown wire in its place.